Universal Presentation Processor

UPX-2 Quick Start

Introduction

Operations Guide – DOC. 6276B
The following steps are designed to guide you through the basic hookup,
configuration and loading of the demo program. The demo program contains files
required by the UPX-2 and the 2-Series control system.

Required Equipment

The following equipment is required to load and run the demo program.
UPX-2 Universal Presentation Processor.
2-Series control system with CUZ file version 3.137 or later.
DTT DualTouch touchpanel
®
PS/2
keyboard (not included)
PS/2 mouse (not included)
USB cable for connecting UPX-2 to DTT DualTouch touchpanel
(included with DTT DualTouch touchpanel)
RGB cable for connecting UPX-2 to DTT DualTouch touchpanel
(included with DTT DualTouch touchpanel)
Power cables (included with UPX-2 and DTT DualTouch touchpanel)
®
Cresnet
cable for connecting the UPX-2 to the 2-Series control system
(not included)

Hook Up

Refer to the following diagrams and connect the UPX-2 in the following order.
1. You must connect a PS/2 keyboard and mouse to the UPX-2 to establish
communication for the first time. After the initial setup, the mouse and
keyboard will not be required except for troubleshooting.
2. Connect the DTT-15V2 or DTT-17 to the UPX-2 using the supplied
DVI/RGB cable and USB cable. The DVI/RGB adaptor cable is connected
to RGB OUTPUT A. The USB cable is connected to a USB port on the
UPX-2.