Step 6b. Connect the column to a purged packed inlet
Getting Started
The checkout liner and insert have been installed in the inlet at
the factory.
If your insulation cup is not installed, begin at line 1. Otherwise,
begin at line 4.
Materials required
Column nut and ferrule
Column cutter
1/4-inch wrench
Metric ruler
Insulation cup
No-hole ferrule
1 Plug the inlet fitting with a no-hole ferrule
Inlet fitting
Capillary liner
Column nut with
no-hole ferrule
Insulation cup
Figure 18
Plugging the inlet
Preparing for Operation
(Figure
18).
55