Agilent Technologies 6820 Getting Started page 76

Gas chromatograph
Table of Contents

Advertisement

Preparing for Operation
C A U T I O N
76
19 ± 1 mm
Withdraw column
1-2 mm
Figure 39
Install the checkout column in an ECD
5 Leak-test the installation at the column nut. If necessary,
tighten fitting(s) further only enough to stop leakage.
Leak-detection fluids often leave contaminating residues. After each
application, the area checked should be rinsed with CH
and allowed to dry.
Detector fitting
Makeup gas adapter
with liner
Column nut
Septum
Column
OH (methanol)
3
Getting Started

Advertisement

Table of Contents
loading

Table of Contents