Checking Performance
ECD checkout conditions
84
Set up the GC as shown in
of setpoint entry.
Table 15
ECD checkout conditions
Column
Sample
Inlet
Temperature
Initial pressure
Mode (split/splitless)
Purge time (split/splitless)
Purge flow (split/splitless)
Detector
Temperature
Makeup + anode flow
Offset
Oven
Init temp
Init time
Rate
Final temp
Final time
Table
15. See
page 79
DB-1, 15 m x 0.53 mm x 0.5 µm, part
number 125-1017
1 µL of ECD checkout, 18713-60040
Purged packed or split/splitless
250 °C
0.049 MPa (7.2 psi) for 20 mL/min
nitrogen at 80 °C
Splitless
0.75 min
60 mL/min
ECD
300 °C
33 mL/min of nitrogen
Less than 400 display counts
80 °C
0 min
15 °C/min
180 °C
2 min
for an example
Getting Started