INSTALLATION PREREQUISITES

The following items should be completed prior to installing the Total Access 1248:
1. Make sure that the network feed is in place.
2. Make sure that local power is available and that the required fuses are installed.
The maximum power draw for the Total Access 1248 system is 75
watts.
ADTRAN recommends an external fuse rated at 3.0 amps.
3. Complete
Table 3-2
Access 1248.

Table 3-2. Turn-up and Provisioning Prerequisite information

Item Description
Network Feed/Aggregation System IP Address
Network Feed/Aggregation System Port
Total Access 1248 IP Address
Total Access 1248 Default Gateway
Total Access 1248 Subnet Mask
Total Access 1248 VPI/VCI
Number of Network Facilities Feeding the Total Access 1248
CLEI Code/System Name
61179641AL1-5C
CAUTION
with the information that is needed to turn-up and provision the Total
Installation Prerequisites
Value
3-3