Vertical Installation; Mounting The Load On The Shaft; Feather Key - LinMot PR02-52x60-R 37x120F-HP-R-100 MS00 TS00 Installation Manual

Linear rotary motors
Table of Contents

Advertisement

Installation Guide Linear Rotary Motors

4.2.2 Vertical Installation

4.3 Mounting the Load on the Shaft

The assembly and disassembly of the load mass must not take place in the mechanical end
stops of the linear movement. An external support must be used.

4.3.1 Feather Key

The load mass is mounted either by means of a feather key or a shaft-hub clamping.
For the first mounting variant, a feather key slot is incorporated at the end of the shaft.
Ordering Information
Item
Parallel keys deep
pattern
NTI AG / LinMot
The T-slots on the underside of the PR02 are used for stable
vertical mounting (see explanation above). In addition, the front of
the motor should be fixed using the 4 tapped holes. The positions of
the tapped holes can be found in the "Dimensions" section.
6
5
Description
face side domed / DIN 6885 A / ISO R773
4x4x10, steel C 45 K, plain
PR02-52
In order to avoid overdetermination of the different
motor bearings, the support must have a minimum
clearance. This compensates for any tolerances in the
linear rotary motor.
ENG
Feather key slot
Item-No.
0230-0269
Page 13 / 48

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pr02-52x60-r 37x120f-hp-r-100 ms01 ts00Pr02-52x60-r 37x120f-hp-r-100 ms04 ts00Pr02-52x60-r 37x120f-hp-r-100-l ms00 ts00Pr02-52x60-r 37x120f-hp-r-100-l ms01 ts00Pr02-52x60-r 37x120f-hp-r-100-l ms04 ts00Pr02-52x60-r 37x120f-hp-r-100 ms00 ts01 ... Show all

Table of Contents