Verifying and Booting Superdome
Performing a Visual Inspection and Completing the Installation
Performing a Visual Inspection and Completing the Installation
After booting the system, you should carefully inspect it and reinstall the EMI covers. Here are the steps
required to perform a final inspection and complete the installation:
Step 1. Visually inspect the system to verify that all components are in place and secure.
Step 2. Check that the cables are secured and routed properly.
Step 3. Check that the cell board ejectors are secure.
If the ejectors are broken or open, the cell board is disconnected.
Figure 4-8Cell Board Ejectors
Step 4. Reinstall the front EMI panel.
100
Cell Board Ejector
Cell Board Ejectors
See Detail
60IN055A
8/9/00