Performing A Visual Inspection And Completing The Installation - HP 9000 Superdome SX2000 Installation Manual

Hp installation guide, hp integrity superdome/sx2000 and hp 9000 superdome/sx2000 servers
Hide thumbs Also See for 9000 Superdome SX2000:
Table of Contents

Advertisement

Figure 54 Attaching Rear Kick Plates
4.
Perform steps 1–3 on the right kick plate.
5.
Position the upper flange of the center kick plate under the I/O trays complementary mounting
bracket, to retain the center kick plate top flanges. No top screws are needed on the center
kick plate. Orient this asymmetrical bracket with the hole located nearest the edge in the up
position.
6.
Using a T-20 driver, tighten the thumbscrews at the bottom of the center kick plate.

Performing a Visual Inspection and Completing the Installation

After booting the system, carefully inspect it and reinstall the EMI panels. To perform a final
inspection and complete the installation, follow these steps:
1.
Visually inspect the system to verify that all components are in place and secure.
2.
Check that the cables are secured and routed properly.
3.
Check that the cell board ejectors are secure
If the ejectors are broken or open, the cell board is disconnected.
58
Installing the System
(Figure
55).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Integrity superdome9000 superdome9000 sx2000

Table of Contents