1. Hook the flange at the lower corners of the EMI panel into the holes on the SPU cabinet.
Figure 4-9Front EMI Panel Flange and SPU Cabinet Holes
2. Position the panel at the top lip and lift the panel up while pushing the bottom into position.
You may have to compress the EMI gasket to get the panel to seat properly.
Chapter 4
Performing a Visual Inspection and Completing the Installation
Hole
Flange
Verifying and Booting Superdome
See Detail
60IN054A
8/9/00
101