Equipment Checklist - HP 9000 Superdome Installation Manual

Hide thumbs Also See for 9000 Superdome:
Table of Contents

Advertisement

Equipment Checklist

Check that you have the following equipment before you begin assembling and cabling the system:
Leveling feet
Cabinet brackets and screws (set of four)
USB cable (P/N A5201-63058)
5" flex cables (set of six)
8" flex cables (set of two)
Appendix G
Connecting Multiple SPU Cabinets
Equipment Checklist
181

Advertisement

Table of Contents
loading

Table of Contents