Transceiver Unit - Furuno FSV-75 Installation Manual

Half-circle color scanning sonar
Hide thumbs Also See for FSV-75:
Table of Contents

Advertisement

2.3

Transceiver Unit

2.3.1
Internal wiring and cable clamp position
Secure each cable with these wiring
clamps.
Note: Route the LAN cable using only the
lower clamps.
Clamp
position
1
2
3
4
5
6
7
8
9
*: Fabricate the cables referring to section 2.3.2.
TRX3 board
CN-TR603
TRX4 board
CN-TR604
TRX5 board
CN-TR605
Secure each cable with
these wiring clamps.
Cable clamp
Connect to
CN-TR601
CN-TR602
CN-TR603
Matching box
CN-TR604
CN-TR605
CN-TR201
Processor unit
CN-TR401
Control box
CN-TR501
CN-TR301
Processor unit
TB-TR101
100/110/115/230/230 VAC
TRX2 board
CN-TR602
TRX1 board
CN-TR601
CN-TR201
CN-TR301
CN-TR401
CN-TR501
Input voltage toggle switch
(S605, S604, S603)
5
4
3
2
1
6
Cable from
2. WIRING
TB-TR101
Ground securing plate
Secure the copper
strap.
7
8
9
Cable
10CA10110
DTIC5E350SLABVCVxxT*
10CA10147
10S2380*
DPYCY-2.5*
2-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsv-75-3d

Table of Contents