Furuno FSV-75 Installation Manual page 32

Half-circle color scanning sonar
Hide thumbs Also See for FSV-75:
Table of Contents

Advertisement

1. MOUNTING
1.4.2
Tabletop mounting with KB fixture
The control unit can be mounted with the KB fixture, which mounts the unit at an angle.
1. Drill four pilot holes in the mounting location for mounting screws, referring to the
outline drawing at the back of this manual.
2. Secure the KB fixture (supplied) to the mounting location, using four self tapping
screws (φ5×20, supplied).
Note: Secure the KB fixture so that the cutout is located on the side farthest from
the operator.
Cutout should be located on
the side farthest from the
operator.
3. Attach a ground wire (IV-1.25sq, supplied locally) to the ground terminal at the
bottom of the unit, then connect the other end of the ground wire with the ship's
ground.
*
4. Secure the control unit the KB fixture, using four binding screws (M5×20, sup-
plied).
1-24
Ground screw*
: Use the screw that is preattached to the ground terminal.
Self-tapping screw
(Ø5×20, 4 pcs)
Ground wire
KB fixture

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsv-75-3d

Table of Contents