Transceiver Unit - Furuno CH-250 Installation Manual

Hide thumbs Also See for CH-250:
Table of Contents

Advertisement

On mounting the control unit separate from the monitor unit, the optional control unit separate kit
is required. Mount the control unit same as the above procedure. See the outline drawing at the
back of this manual to mount.
Type: OP06-15-1.5 NEW Code no.: 006-559-140: with 1.5 m cable
Type: OP06-15-5 NEW
Name
Cable
MJ-A10SPF0002-015
MJ-A10SPF0002-050
Bracket
06-021-2112
Mounting Plate
06-021-2111-1
Tapping Screw
5x20
Cosmetic Cap
DP-687
Hex. Screw
M4x12
Bind Screw
M4x10
1.2

Transceiver Unit

1.2.1
General mounting considerations
The mounting location should be well ventilated and dry.
The unit can be mounted on bulkhead or the deck.
Secure the maintenance space shown in drawing below for ease of maintenance and
service.
The maximum cable length between the transceiver unit and the raise/lower drive unit cable
is 50 m.
The maximum cable length between the transceiver unit and the monitor (interface) unit is
10 m.
1.2.3
Mounting method
Fasten the transceiver unit with four tapping screws (5X20).
For bulkhead mounting, tighten upper tapping screws so there is 5 mm clearance between
bottom of screw head and bulkhead, and screw slots of the unit. Then fasten lower screws.
Code no.: 006-559-150: with 5 m cable
Type
000-142-878
000-131-411
100-281-880-10
100-279-741-10
000-162-608-10
000-165-997-10
000-162-939-10
000-807-331
Code no.
7
Qty
Remarks
1
For 1.5 m cable
For 5 m cable
1
1
2
2
4
4
For monitor

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ch-250s

Table of Contents