Optimum OPTImill MT 60 Operating Manual page 58

Table of Contents

Advertisement

Interval
Where?
Start of work,
after every
maintenance or
repair work
The first time
after 3 month,
then every
6 months
The first time
after 3 month,
then every
6 months
EN
MT60
58
What?
How?
The oil level must at least attain the centre resp. top
marking of the oil sight glass.
The oil level must at least attain the centre resp. top
Oil level control
marking of the oil sight glass.
Img.6-2:
For oil change use an appropriate collecting tray of suffi-
cient capacity.
Have the milling spindle run for a few minutes, the oil
will heat up and will slightly penetrate from the opening.
Unscrew the screw from the drain hole.
Oil change
Unscrew the screw from the filler hole.
Close the drain hole if no more oil drains.
Fill up to the middle of the reference mark of the oil sight
glass into the filler hole using a suitable container.
For oil change use an appropriate collecting tray of suffi-
cient capacity.
Have the milling spindle run for a few minutes, the oil
will heat up and will slightly penetrate from the opening.
Unscrew the screw from the drain hole.
Oil change
Unscrew the screw from the filler hole.
Close the drain hole if no more oil drains.
Fill up to the middle of the reference mark of the oil sight
glass into the filler hole using a suitable container.
Translation of original instruction
Gear feed oil sight glass
Oil sight glass
Maintenance
Version 1.0.4 - 2020-08-04

Advertisement

Table of Contents
loading

This manual is also suitable for:

3336090

Table of Contents