E.7.1 Routing the Load Cell Cable
3BSE029382R0101 Rev C
c
 a
b
b
 a
Load cell PFTL 101  a
A/AE/AER
B/BE/BER
Figure E-3. Drilling Dowel Pin Holes
The cable must be supported with clamps and routed to prevent force shunting through the
cable.
Tension Electronics PFEA113, User Manual
Section E.7.1 Routing the Load Cell Cable
 a
 a
Tubular
b
c
dowel pin
8.4
8
15 15
12.5
20
12
15
c
NOTE
Do not drill in this
area, as internal
wiring may be
damaged.