Verifying The Operation Of New Transceivers - Broadcom Brocade G720 Hardware Installation Manual

Table of Contents

Advertisement

G720-Install-IG101 Installation Guide
4. Position a cable so that the key (the ridge on one side of the cable connector) is aligned with the slot in the transceiver.
Insert the cable into the transceiver until the latching mechanism clicks.
Cables are keyed so that they can be inserted in only one way. If a cable does not slide in easily, ensure that it is
correctly oriented.

Verifying the Operation of New Transceivers

You can use the following commands to verify if the transceivers are working correctly:
errDump
fabricShow
sfpShow
switchShow
Refer to the Brocade Fabric OS Command Reference Manual for output examples and descriptions.
Broadcom
®
Brocade
G720 Switch Hardware Installation Guide
G720-Install-IG101
57

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Brocade G720 and is the answer not in the manual?

Table of Contents

Save PDF