Powering Down The Device - Broadcom Brocade G720 Hardware Installation Manual

Table of Contents

Advertisement

G720-Install-IG101 Installation Guide
This command uploads the device configuration to the server, making it available for downloading to a replacement
device if necessary.
NOTE
If Virtual Fabrics (VF) is enabled, you need to use the configupload -vf command only once to upload
configuration for the virtual fabric (all logical switches configured on the device). For more information, refer
to the discussion of configupload/download in the Brocade Fabric OS Administration Guide.

Powering Down the Device

Perform the following steps to power down the device:
1. Shut down the Fabric OS software using the sysShutdown command.
2. Identify the power-on switches in the nonport-side of the device.
3. Power off both power supplies by setting each power switch to the "O" position.
4. Unplug the power cables from the power source before servicing the device or FRUs.
All devices are returned to their initial state the next time the switch is powered on.
Broadcom
®
Brocade
G720 Switch Hardware Installation Guide
G720-Install-IG101
53

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Brocade G720 and is the answer not in the manual?

Table of Contents

Save PDF