Figure 70
1. Actuator
2. Actuator rod
3. Boom-pivot-pin housing
5.
Swivel the rod-end bearing and apply grease
into the bearing
(Figure
Note:
Wipe off excess grease.
Figure 71
Right Boom
1. Grease the rod-end bearing
6.
Lift the spray section to align the pivot with the
actuator rod.
7.
While supporting the spray section, insert the
clevis pin through both boom pivot and actuator
rod
(Figure
70).
8.
With the pin in place, release the spray section
and secure the pin with the hairpin removed
previously.
g013780
4. Hairpin
5. Clevis pin
71).
g002015
9.
Repeat steps
bearing at the other side of the machine.
54
2
through
8
to the actuator-rod