Guiding Liquids To Waste; Connecting The Solvent Lines - Thermo Scientific thermoscientific Vanquish Pumps C Operating Manual

Table of Contents

Advertisement

5
Installation
5.6.4

Guiding Liquids to Waste

5.6.5

Connecting the Solvent Lines

Page 64
The following liquids collect in the leak tray and flow off through the
drain port at the bottom right of the leak tray into the drain system of
the Vanquish system:
Leaking liquid from the leak tray
Waste liquid from the purge unit: When purging the pump, attach
silicone tubing to the purge outlet on the purge/sensor unit and
guide the free end of the tubing to the drain port outlet.
Figure 15: Drain port (view from top)
No.
Description
1
Waste line from purge unit: routing path to drain port outlet (example)
2
Drain port
3
Drain port outlet (to Vanquish drain system)
4
Leak sensor
For information about how the liquid is discharged to waste through the
Vanquish drain system, refer to the Vanquish System Operating Manual.
The pump is shipped from the manufacturing site with the solvent lines
installed between the components in the pump. To complete the setup,
install the solvent lines between the pump inlet ports and the solvent
reservoirs.
The flow path determines the pump inlet (component at which the
solvent enters the pump) and the solvent flow through the pump.
Pump Type
Binary pump
Pump Inlet
The pump inlets are the solvent selectors.
Pumps C, Pumps F ( VC-Pxx, VF-Pxx)
Operating Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents