Transporting Or Shipping The Device; Preparing The Device For Transport - Thermo Scientific thermoscientific Vanquish Pumps C Operating Manual

Table of Contents

Advertisement

7
Maintenance and Service

7.15 Transporting or Shipping the Device

Follow these steps

7.15.1 Preparing the Device for Transport

Page 188
If you want to transport the device to a new location or if you need to
ship the device, first prepare the device for transport and then move or
ship the device as required. Follow the instructions in this section.
Observe the following safety guidelines:
CAUTION—Heavy Load, Bulky Device
The device is too heavy or bulky for one person alone to handle safely.
To avoid personal injury or damage to the device, observe the following
guidelines:
Physical handling of the device, including lifting or moving, requires
a team effort of two persons.
A team effort is in particular required when lifting the device into
the system stack or when removing it.
Use the carrying handles that were shipped with the device to move
or transport the device. Never move or lift the device by the front
doors. This will damage the doors or the device.
1. Prepare the device for transport. See
Transport
(} page 188).
2. The step depends as follows:
To transport the device to a new location, follow the instructions
¨
in
Transporting the Device to a New Location
To ship the device, follow the instructions in
¨
(} page 190).
To prepare the device for transport, follow these steps:
1. Perform a long-term shut down of the device (see
Shutdown
(} page 114)).
2. Turn off the device with its main power switch and disconnect the
power cord.
3. Remove all cables and flow connections to other devices.
4. Close open flow connections with appropriate plugs, for example,
the plugs you removed when setting up the pump.
Preparing the Device for
(} page 189).
Shipping the Device
Long-Term
Pumps C, Pumps F ( VC-Pxx, VF-Pxx)
Operating Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents