JUMO flowTRANS MAG S Series Safety Manual page 49

Electromagnetic flowmeter for the process industry and hygienic applications
Table of Contents

Advertisement

The configuration jumpers are located on the backplane in the transmitter housing.
BR902 for digital output DO1
BR902 in position 1: standard (non-NAMUR)
BR902 in position 2: NAMUR
(1)
Case lid
(2)
Transmitter plug-in module
(3)
Mounting screws
(4)
Lid lock
Configuration of the digital outputs:
1. Switch off the voltage supply and wait at least 20 minutes before performing the next step.
2. Remove the case lid. (1)  see chapter 3.1 "Notes on opening and closing the housing", page 19.
3. Loosen the screws (3) and pull out the transmitter plug-in module (2).
4. Insert the jumpers at the required positions.
5. Re-insert the transmitter plug-in module (2) and retighten the screws (3).
6. Before restarting, close the housing and secure the case lid (1) by unscrewing the Allen screw (4) to
prevent the case from being opened accidentally.
HART protocol
BR901 for digital output DO2
BR901 in Position 1: Standard (non-NAMUR)
BR901 in position 2: NAMUR
6 Startup
PROFIBUS PA
FOUNDATION Fieldbus
49

Advertisement

Table of Contents
loading

Table of Contents