Replacing Cpms/S10Ve In Existing Projects - Hitachi S10VE User Manual

Table of Contents

Advertisement

C. Replacing Software Products in BASE SET/S10VE
C.7 Replacing CPMS/S10VE in existing projects
You can replace the CPMS of a project with a version and revision of CPMS/S10VE you have installed.
This process uses BASE SYSTEM/S10VE.
To replace the CPMS of a project, you need to be logged in to the PADT as an account with administrator
privileges. If your account does not have administrator privileges, log out and then log in again with an
administrator account.
(1) Start BASE SYSTEM/S10VE.
(2) From the Project menu, select Open. The Project List window appears.
(3) Select the PCs number of the project whose CPMS/S10VE you want to replace, and then click Open.
The following figure shows an example in which the PCs number of the project is 0001.
C-10

Advertisement

Table of Contents
loading

Table of Contents