Q24Dhccpu-Vg - Mitsubishi Electric MELSEC Q Series User Manual

Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

5.2

Q24DHCCPU-VG

The following explains the start-up procedure for Q24DHCCPU-VG.
Module mounting
Check field
Mount the power supply module and the C Controller module on the base unit.
Power supply module
• Mounting on the base unit
• Power supply wiring
C Controller module
• Battery Installation
• Mounting on the base unit
Clearing memory of C Controller module
• Install Setting/monitoring tools for the C Controller module to the
development environment (Personal computer).
• Clearing the battery backup RAM with Setting/monitoring tools
for the C Controller module.
When C Controller module has been initialized, the partner application is deleted.
Page 62, Section 6.1
Hardware Diagnostics
Check the status of the C Controller module hardware.
Module mounting
Install the module to the base unit.
• CPU module (for multiple CPU system configuration)
• I/O module, intelligent function module and network module
Wiring and connection
Arrange wiring:
• Extension cable connection to the extension base unit and base number
setting
• Wiring for external device(s) connected to each module
• Wiring between network modules
Start
To the next page
CHAPTER 5 PREPARATORY PROCEDURE
$QCPU User's Manual
(Hardware Design, Maintenance and Inspection)
Page 116, CHAPTER 8
$Setting/Monitoring Tools for the C Controller
Module Version 4 Operating Manual
Page 75, Section 6.5
$QCPU User's Manual
(Hardware Design, Maintenance and Inspection)
$Manual for respective module
5
55

Advertisement

Table of Contents
loading

Table of Contents