End Of Operation - Dräger Primus SW 4.5n Instructions For Use Manual

Anesthesia workstation
Table of Contents

Advertisement

Operation
Leak Test
Leak Test
The clock symbol disappears when the test is com-
plete and Primus displays the following test results:
A Breathing system
B system compliance compliance (sys.)
C leakage system leak (system)
D leakage Man.Spont. leak (Man.Spont.)
if applicable (values >150 mL/min), see "Leak-
age" on page 84.
The results of the leak test are displayed on the
data screen at all times.
To return to the Standby screen:
Press the soft key exit (E).
The Standby screen is displayed.
Close the vaporizer unit, turn the handwheel to 0.
120
E
A
B
C
D

End of operation

Switch Primus to Standby:
Press the Standby key
rotary knob. The workstation is now in Standby.
The fresh-gas flow is switched off.
Switch off Primus:
Push the system power switch
completely.
Primus is equipped with a power-down delay.
NOTE
When the system power switch is pressed, an
acoustic signal sounds and for 10 seconds a mes-
sage is displayed.
This message is displayed:
Please wait while device shuts down. Make sure
that the O
safety control valve is closed. Push
2
the system power switch to cancel this power-
down and return to the previous operational
mode.
During this time, Primus can be restarted immedi-
ately by pressing the system power switch again.
WARNING
Risk of fire
In order to avoid the accumulation of poten-
tially hazardous oxygen concentrations in the
anesthesia machine or in the operating room,
all oxygen supplies must be closed and the
anesthesia machine disconnected from them
when the anesthesia machine is not in use.
CAUTION
Risk of supply failure
If the valves remain open when connected to the
central gas supply, gas may be withdrawn from
the reserve gas cylinders.
Close cylinder valves whenever the central supply
is sufficient.
Instructions for use Primus SW 4.5n
and confirm via the
in

Advertisement

Table of Contents
loading

Table of Contents