Installation • Commissioning
Caution!
The maximum permitted ambient temperature can be found in the technical data for the respective
Power Panel device.

3 Commissioning

The Power Panel comes with Automation Runtime as default. Automation Runtime must first be installed in order
to be able to operate the Power Panel. There are 3 methods available:
• AR transfer over the network with DHCP server
• AR transfer over the network without DHCP server
• USB stick - remote install structure
AR transfer over the network with DHCP server
See the AS help documentation
AR transfer over the network without DHCP server
• Connect the Power Panel to the network
• Start the Power Panel
• Create a new project with Power Panel in Automation Studio
• Open the browse dialog box in online settings
• Right-click on Power Panel with IP 0.0.0.0 and select "Set IP Parameters"
• The settings can be taken from the following example:
80
Figure 24: Power Panel - Mounting orientations
Power Panel C-Series User's Manual V1.00

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Power Panel C Series and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF