Chassis Harness Installation - Raven ICD Sidekick Pro Installation Manual

Injection for case trident
Table of Contents

Advertisement

CHASSIS HARNESS INSTALLATION

1. Locate the fuse box in the front left corner of the spray skid.
FIGURE 44. Fuse Box
70 Amp Fuse
2. Route the power wire from the injection chassis harness (P/N 115-2500-016) into the bottom of the fuse box.
3. Install the supplied 70 amp fuse and secure top with supplied nut.
4. Install the power wire on the bottom stud and secure with the supplied nut.
5. Locate the skid ground stud.
FIGURE 45. Ground Stud Location
Ground Stud
Locations
6. Install the ground wire on the stud.
7. Route and secure the chassis cable to the rear of the machine along the left side of the skid frame.
IMPORTANT:
Do not secure the cable to the machine chassis to prevent damage if the skid is removed.
8. Locate the machine's logic power and CAN connections along the left rear corner of the sprayer skid.
P/N 016-0171-675 Rev. A
INSTALLATION
35

Advertisement

Table of Contents
loading

Table of Contents