Hardware Installation; Base Bracket Installation - Raven ICD Sidekick Pro Installation Manual

Injection for case trident
Table of Contents

Advertisement

C
3
HAPTER
1. Remove one of the hydraulic hoses for the main boom center raise/lower hydraulic manifold and supply line
tee fitting along the right side of the sprayer frame.
IMPORTANT:
To prevent crossing hoses, remove one hydraulic hose at a time for the main boom center raise/lower circuit.
FIGURE 2. Hydraulic Hose Locations.
Remove
and
Replace
2. Install one of the supplied -8 90° flat face fittings on the tee fitting along the right side of the sprayer frame.
3. Connect one of the supplied hoses to the previously installed -8 90° flat face fittings and the open port of the
main boom raise/lower hydraulic manifold.
4. Repeat step 1 through step 3 for the second hose.

HARDWARE INSTALLATION

BASE BRACKET INSTALLATION

1. Place bases (P/N 116-0159-822) on the lower cross tube.
8
ICD Sidekick Pro Injection for Case Trident Installation Manual
Install 90° Elbow

Advertisement

Table of Contents
loading

Table of Contents