Connect Overflow; Three Tanks With Two Pumps And Shared Chemical Plumbing Installation - Raven ICD Sidekick Pro Installation Manual

Injection for case trident
Table of Contents

Advertisement

2. Connect the pump two output to the injection point on the mixer with 1/2" hose. Secure with the supplied hose
clamps.

CONNECT OVERFLOW

1. Connect a 1" hose to the overflow ports on the top of the tank. Secure with the supplied hose clamps.
2. Route the hose down the side of the cage. Secure the hose to the cage using the supplied zip ties.
THREE TANKS WITH TWO PUMPS AND SHARED CHEMICAL PLUMBING
INSTALLATION
NOTE:
Refer to Figure 6 on page 51 for a plumbing schematic for three tanks with two pumps.
FIGURE 42. Three Tank with Two Pump and Shared Chemical Installation Example
To Recirculation
on Tank 1
P/N 016-0171-675 Rev. A
From Below Machine
Fill 1
Fill 2
To Injection
Point
Fill 1
Fill 2
To Recirculation
on Tank 3
To Injection
Point
To Rinse Tee
INSTALLATION
31

Advertisement

Table of Contents
loading

Table of Contents