With the Rollers on level ground, Place 5/8-11 U-bolts
over the center and outer frame cross tubes and through
the Scraper Brackets. Hand tighten Locknuts. The
Scraper Bar is pre-assembled with scrapers attached
(spaced approximately 6 inches apart). Remove the eight
1/2-13 Locknuts from the U-bolts where the Scraper Bar
will attach to the Scraper Brackets. See Figure 2-25.
Roughly center and attach the Scraper Bar to the
Figure 2-25: V-Wheel Scraper Installation
Scraper Brackets with previously removed eight 1/2-13
Locknuts. Tighten all hardware.
NOTE
Allow a small amount of clearance, approximately 1/4"
between scrapers and wheel surface.
10' Model shown other models similar.