Delta PCS100 Maintenance Manual page 77

100kw power conditioning system
Hide thumbs Also See for PCS100:
Table of Contents

Advertisement

Important Safety Instructions
It is important to remember that the PCS100 is designed to supply power even when it is disconnected
from the power grid. The interior of the PCS100 is unsafe until the DC power source is disconnected
and the AC/DC inputs are disengaged. It is recommended to wait a period of at least five minutes for
capacitor bleed-off before attempting to service any components.
Note:
Maintenance should only be performed by qualified personnel.
Lethal voltage is present in the PCS100. The unit must not be operated with the front
door doors open. At no time should you make any assumptions of the electrical state of
the PCS100.
Before attempting any work around the PCS100, observe the following precautions:
Remove any watches, rings, or other metallic accessories.
Only use tools with insulated handles.
Wear rubber gloves and boots.
Do not lay tools or metal parts on top of the cabinet.
Removing a Door Sensor
1. Open the front door. See "Opening a Front Door" on page 20.
2. Remove the screws and washers securing the wires.
3. Remove the wires.
4. Remove the screws securing the door sensor.
Maintenance Manual
ON
ON
OFF
OFF
Figure 84. Removing the Wires
65
Door Sensor
Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents