Enclosure Front and Side Sections

This section describes the physical characteristics of the PCS100. These converters are housed in
IP55 enclosures. To better describe all of the components, the respective location are divided as
follows: Front Side Locations, Access Door Locations, Front Compartment Locations (Internal), Rear
Compartment Locations (Internal), and Rear Side Locations.
Front Side Locations
Table 2: Front Panel View
No.
Description
1
Air exit (grill)
3
DC disconnect, emergency stop button
5
Air outtake (filters)
Enclosure door latch, lockable (handle and
7
key hole)
Front side base cover
Provides access for forklift
9
Provides access for front side cable
routing
Maintenance Manual
ON
OFF
STANDBY
RUN
FAULT
DC DISCONNECT
AC DISCONNECT
ON
ON
OFF
OFF
Figure 2. Front Panel View
No.
2
Display panel (keypad and display)
4
Front access door
6
Air intake (filters)
8
AC and DC disconnect switches
2
Hardware Introduction
1
2
3
4
5
6
7
8
9
Description

Hide quick links: