Igbt Heatsink (Hsk) - Delta PCS100 Maintenance Manual

100kw power conditioning system
Hide thumbs Also See for PCS100:
Table of Contents

Advertisement

14. Install the cover into the cabinet.
15. Secure the cover with nuts.
16. Close the rear door. See "Closing a Rear Door" on page 28.

IGBT Heatsink (HSK)

WARNING!
!
Read the "Safety Instructions" on page ix on the first at the beginning of this manual before
performing any service on the components. Ignoring safety instructions may result in injury,
damage or death.
CAUTION!
!
D
ANGEROUS VOLTAGE LEVELS MAY BE PRESENT FOLLOWING DISCONNECTION
CABINET UNTIL A REASONABLE PERIOD OF TIME HAS ELAPSED
D
,
EATH
SERIOUS INJURY
Maintenance Manual
Figure 272. Installing the C Board Cover
,
OR HARDWARE DAMAGE CAN RESULT IF CAUTION IS NOT TAKEN
178
Maintenance
. D
O NOT OPEN THE
.
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents