Delta PCS100 Maintenance Manual page 138

100kw power conditioning system
Hide thumbs Also See for PCS100:
Table of Contents

Advertisement

8. Slide and remove the D board.
Installing a D Board
1. Align the holes on the D board with the captive screws on the chassis.
2. Slide to lock the D board in place as the following illustration.
Maintenance Manual
Figure 187. Removing a D Board
Figure 188. Installing a D Board
126
Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents