System Sampling Board (H Board) - Delta PCS100 Maintenance Manual

100kw power conditioning system
Hide thumbs Also See for PCS100:
Table of Contents

Advertisement

2. Align the holes on the R board with the holes on the control box.
3. Secure the R board and the control box with screws.
4. Connect the cables to the R board.
5. Close the control box door. See "Closing a Control Box Cover" on page 32.
6. Close the front door. See "Closing a Front Door" on page 22.

System Sampling Board (H Board)

WARNING!
!
Read the "Safety Instructions" on page ix on the first at the beginning of this manual before
performing any service on the components. Ignoring safety instructions may result in injury,
damage or death.
CAUTION!
!
D
ANGEROUS VOLTAGE LEVELS MAY BE PRESENT FOLLOWING DISCONNECTION
CABINET UNTIL A REASONABLE PERIOD OF TIME HAS ELAPSED
D
,
EATH
SERIOUS INJURY
Maintenance Manual
Figure 210. Installing a R Board
Figure 211. Connecting the Cables
,
OR HARDWARE DAMAGE CAN RESULT IF CAUTION IS NOT TAKEN
140
Maintenance
. D
O NOT OPEN THE
.
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents