Delta PCS100 Maintenance Manual page 104

100kw power conditioning system
Hide thumbs Also See for PCS100:
Table of Contents

Advertisement

Installing an AC Switch
1. Align the holes on the AC switch with the posts on the chassis.
2. Secure the AC switch with screws.
3. Align the wires, washers and brackets with the holes on the AC switch.
4. Secure the wires, washers and brackets with screws.
Figure 122. Installing the Wires, Washers and Brackets
Maintenance Manual
ON
OFF
Figure 121. Installing an AC Switch
ON
OFF
92
Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents