Air Intake Filter - Delta PCS100 Maintenance Manual

100kw power conditioning system
Hide thumbs Also See for PCS100:
Table of Contents

Advertisement

Installing an Auxiliary Transformer
1. Align the holes on the auxiliary transformer with the holes on the chassis.
2. Secure the auxiliary transformer with screws.
3. Close the control box door. See "Closing a Control Box Cover" on page 32.
4. Close the front door. See "Closing a Front Door" on page 22.

Air Intake Filter

The filters need to be checked and changed periodically. Check the dustiness of the air inlet meshes to
ascertain if cleaning is necessary.
Important Safety Instructions
It is important to remember that the PCS100 is designed to supply power even when it is disconnected
from the power grid. The interior of the PCS100 is unsafe until the DC power source is disconnected
and the AC/DC inputs are disengaged. It is recommended to wait a period of at least five minutes for
capacitor bleed-off before attempting to service any components.
Note:
Maintenance should only be performed by qualified personnel.
Lethal voltage is present in the PCS100. The unit must not be operated with the front
door doors open. At no time should you make any assumptions of the electrical state of
the PCS100.
Maintenance Manual
Figure 233. Installing an Auxiliary Transformer
154
Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents