Cable Preparation For Itrak Power Supply Output Power Cables - Allen-Bradley Kinetix 5700 iTRAK Installation Instructions Manual

Power supply and bus conditioner module
Table of Contents

Advertisement

Cable Preparation for iTRAK Power Supply Output Power Cables

Follow these instructions to prepare the wires to create custom length 2198T-CHBFLS8-12Axx cables.
These instruction steps assume that the cable has already been cut to the desired length.
1. Mark the cable at 138 mm (5.4 in.) from the end.
2. Carefully cut away the outer jacket at the mark.
Be mindful not to damage the braided shield underneath.
3. Measure 32 mm (1.26 in.) from where the outer jacket ends and cut and remove the braided metal shield.
Save the braided metal piece that was trimmed for use in
4. Measure 75 mm (3 in.) from where the outer jacket ends or 43 mm (1.7 in.) from where the shield ends, and trim the blue filler material.
5. Pull back the outer braided shield and carefully create an opening in the braid as close as possible to where the outer jacket ends.
6. Feed the internal shielded twisted pair through the opening in the outer braided shield, and pull it through tight.
The shielded twisted pair is now outside of the main braided shield and the two shields are in contact.
(Rotated View)
138 mm (5.43 in.)
Can be longer and trimmed at end
remove outer jacket only.
32 mm
43 mm (1.7 in.)
(1.26 in.)
Trim filler material.
Pull shielded twisted pair free by forming
an opening and thread it back through
the carefully expanded shield.
Exposed twisted shielded pair is stripped
to the shield and the two shields are in
contact.
Rockwell Automation Publication 2198T-IN001C-EN-P - October 2019
Kinetix 5700 iTRAK Power Supply and iTRAK Bus Conditioner Module
step
8.
Dimensions are in mm (in.)
15

Advertisement

Table of Contents
loading

Table of Contents