Setup The Equipment List - Omni 4000 Series Installation Manual

Flow computer
Hide thumbs Also See for 4000 Series:
Table of Contents

Advertisement

3.
a. Fill in the information in the
General Setup screens by clicking
on each tab.
b. Click Apply when each screen is
complete to apply your changes.
Press F1 to access
OMNICONNECT Help for
assistance.

4.10.2 Setup the Equipment List

The Equipment List screen is especially important, as these selections control the
meter run requirements for specific devices in your system. However, you can come
back to this screen at any time during configuration to adjust the list as needed.
Any new adjustments may affect other previously configured settings throughout the
flow computer.
To set up the Equipment List, follow these instructions:
1.
For the Equipment List screen, two
Meter Runs are automatically chosen by
default. Add or subtract Meter Runs and
select their applications, as required.
This example shows the liquid
application equipment list. There
are no input and output selections
for Stations or the Prover in the
gas application equipment list.
2.
After making the necessary selections in
the Equipment List screen, click the
Apply button.
4-55
OMNI 4000/7000 Installation Guide – Rev H
Configuration

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Omni 4000 Series

This manual is also suitable for:

7000 series

Table of Contents