Bosch Conettix B465 Installation And Operation Manual page 28

Universal dual path communicator
Hide thumbs Also See for Conettix B465:
Table of Contents

Advertisement

28
en | Installation
Figure 4.10: 24VDC wiring to a UL Listed fire control panel or UL Listed power supply
Callout - Description
1 - Conduit required for use with external wiring
2 - 24 VDC from UL Listed fire control panel wiring or UL Listed power supply wiring
3 - Battery wires (red and black)
4 - 12 V, 7-18 Ah sealed lead-acid rechargeable battery (D126/D1218)
5 - B465ground wire connection
Notice!
24 VDC primary power source is polarity sensitive.
If you reverse the polarity for the 24 VDC primary power source, the B465 runs, but shows a
primary power failure.
Self diagnostics at power up and reset
The B465 completes self-diagnostic tests of hardware, software, and configuration at power
up and at reset. The tests complete in 10 to 30 seconds. If the B465 fails a test, a System
Trouble occurs. Trouble LED's turn on or outputs activate depending on configuration.
2017.11 | 05 | F.01U.311.207
2
1
5
Installation and Operation Manual
Y
X
COMMUNICATION MODULE 1
SDI2
Device Bus
R Y G B
24 VDC
2.2 k
or
Line Resistors
16.5 VAC
1 COM 2
BATTERY
+
-
16.5 VAC
NO C NC
C
NO
C
NO
12V
1
COM
BATTERY
RELAY 1
RELAY 2
RELAY 3
AUX COM
_
3
+
4
Conettix Universal Dual Path Communicator
MODULE 1
MODULE
RELEASE
ETHERNET
100BASE-T
LINK
USB
SYSTEM TROUBLE
TX
TX
RX
AC
AC
BATTERY
INPUTS
End of
PANEL
PANEL
3 COM 4
LINE 1
LINE 2
PNL LINE 1
PNL LINE 2
2
3
COM
4
Bosch Security Systems, Inc.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents