Testing The System - Bosch Conettix B465 Installation And Operation Manual

Universal dual path communicator
Hide thumbs Also See for Conettix B465:
Table of Contents

Advertisement

92
en | Maintenance and troubleshooting
3.
4.
5.
11.7

Testing the system

Test the system completely after installing and programming the B465. Test the B465, the
control panel and all devices once a week for proper operation.
Notice!
After system installation and any B465 programming, perform a complete system test (UL 864
requirement). A complete system test includes testing the control panel, B465,all devices,
and communication paths for proper operation.
2017.11 | 05 | F.01U.311.207
Click the port that has the B465 Dual Path Communicator option.
Click Ok.
Press the Enter key and login.
Installation and Operation Manual
Conettix Universal Dual Path Communicator
Bosch Security Systems, Inc.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents