MAINTENANCE SCHEDULE

INSTALLATION
DATE:
It is a condition of your warranty cover that the items in the schedule below are checked (and action taken as required) once every
3 months from the date of installation by a qualified, licensed technician, and that the schedule is properly filled out (i.e. name,
signature, date, action taken). Note that Air inlet filters must be inspected and cleaned every month, not just every 3 months.
Even after the warranty period expires, please continue to have the product maintained as per the items and the frequency in the
schedule, using the additional Maintenance Schedule pages provided. This will help to prolong the life of the cooler and keep it
running efficiently.
ATTENTION! if your cooler is used for personal residential household purposes, then these additional pages will need to be used for
recording the services required during the warranty period.
SERVICE ITEM
Electrical Connections and
Component Operation
Electrical wiring
Fan motors
PCBs & Control box
Drain pump
Water inlet solenoid
Water probe
Chlorinators
Water pump
Water Distribution System
Water distribution system -
hoses and spreaders
Water level
Cabinet and Accessories
Cabinet integrity / leaks
Air inlet
Air inlet filters - 1st month of
quarter
Air inlet filters - 2nd month of
quarter
Air inlet filters - 3rd month of
quarter
Tank
Fans
General Operation
Start up and run sequence
Control operation
General Installation
Electrical connections
Water connections
Duct condition
Roof penetrations
Mounting & Vibration isolation
Access
|
CW-P15 Indirect Evaporative Cooler 859740-G
33
INSTALLER:
CHECK/ADJUST
Q1
Q2
Q3
Q4
CLEAN
Q1
Q2
Q3
Q4
REPLACE
Q1
Q2
Q3
Q4