Electrical Supply Installation; Usa - 1 Or 2 Phase, 200 - 240V / 60 Hz Supply - Seeley Climate Wizard CW-P15 Installation Operation & Maintenance

Indirect evaporative cooler
Table of Contents

Advertisement

INSTALLATION

ELECTRICAL SUPPLY INSTALLATION

Please Note! There are specific models to match regional
voltages and frequencies which are not interchangeable.
Please ensure the cooler matches the electrical requirements
shown in the following pages.
Installation of the cooler must conform to local electrical
rules, regulations and standards.
AUSTRALIAN / EUROPE – 1 Phase, 220 - 240V / 50 Hz SUPPLY

USA - 1 or 2 Phase, 200 - 240V / 60 Hz SUPPLY

SUPPLY
PRESSURE
DR1 Drain 1
DR2 Drain 2
DR3 Drain 3
C1
Chlorinator 1
C2
Chlorinator 2
SOL Solenoid
WPR Water Probe
MC1 Motor Control 1
MC2 Motor Control 2
MC3 Motor Control 3
W/C Cooler Control RJ12
DSW DIP Switch
|
CW-P15 Indirect Evaporative Cooler 859740-G
11
EXHAUST
PRESSURE
PRESSURE
SENSOR
SOL
C1
DR1 DR2 DR3
MC3
MC2
MagIQcool
or
MagIQtouch
SUPPLY
or
FAN
Switch Plate
or
M1 BMS
or
EXHST
FAN
MS1 BMS
It is a requirement of Seeley International that all coolers
be wired with a dedicated circuit and circuit breaker to the
distribution board.
An isolation switch with all-pole
disconnection must be installed
on or adjacent to the coolers.
DO NOT ATTACH
ILL3530-A
ISOLATING SWITCH
TO UNIT DUCTING,
AS REMOVAL
OF DUCTING IS
REQUIRED FOR
SERVICING AND
MAINTENANCE OF
FAN MOTORS
F2
FUSE
3 AG / 3.15 A / 250V
DSW
C1
C2
SOL
WPR
MC1
W/C
J4
EMC
FILTER
J5
CONTACTOR
J4
EMC
T
FILTER
T
J5
J22
J20
J21
J32
J33
J23
CIRC
J25
PUMP
J24
J26
DRAIN
J28
PUMP
J27
J29
J31
J30
T
EARTH
J1
T
ACTIVE
J2
J3
T
NEUTRAL
J1
MAINS
J2
CONNECTION
J3
863413-G
ILL35
ILL2266-A
ILL3588-A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents