Connecting Communications Cables; Installing A Double-Bus (2N) System; Connecting Power Cables - Huawei UPS5000-E-80K-LABBS User Manual

Integrated ups, 208 v
Hide thumbs Also See for UPS5000-E-80K-LABBS:
Table of Contents

Advertisement

UPS5000-E-(20 kVA-80 kVA)
User Manual (Integrated UPS, 208 V)

4.1.9.2 Connecting Communications Cables

Procedure
Step 1 Connect one end of the cable to the FE port on the UPS monitoring interface card, and
connect the other end to any PoE port on the smart ETH gateway.
Figure 4-30 Connecting Communications Cables
----End

4.2 Installing a Double-Bus (2N) System

4.2.1 Connecting Power Cables

Procedure
Step 1 Ground each single UPS.
Step 2 Connect AC input and output power cables of each UPS.
Step 3 Connect battery power cables of each UPS.
Step 4 Connect cables to the dual-bus system.
Issue 04 (2020-03-12)
Copyright © Huawei Technologies Co., Ltd.
4 Installation
77