UPS5000-E-(20 kVA-80 kVA)
User Manual (Integrated UPS, 208 V)
4.1.9.2 Connecting Communications Cables
Procedure
Step 1 Connect one end of the cable to the FE port on the UPS monitoring interface card, and
connect the other end to any PoE port on the smart ETH gateway.
Figure 4-30 Connecting Communications Cables
----End
4.2 Installing a Double-Bus (2N) System
4.2.1 Connecting Power Cables
Procedure
Step 1 Ground each single UPS.
Step 2 Connect AC input and output power cables of each UPS.
Step 3 Connect battery power cables of each UPS.
Step 4 Connect cables to the dual-bus system.