IBM TotalStorage 200 Service Manual page 122

Network attached storage
Hide thumbs Also See for TotalStorage 200:
Table of Contents

Advertisement

106
Models 200 and 225 Service Guide
Rack Mounting Instructions
• Review the documentation that comes with your rack enclosure.
• Maintain 15 cm (6 in.) of clearance around your appliance for air circulation.
• Ensure the room air temperature is below 35°C (95°F).
appliance
• Plan the
installation working from the bottom of the rack up.
• Remove the rack doors and the side panels during the installation, if necessary.
• Position the template to the rack so that the edges of the template do not
overlap any other devices to be installed.
• Connect all power cords on the
and grounded electrical outlets.
• Take precautions to prevent the rack from overloading the power outlets
when you install multiple devices in a rack.
• Do not place any object weighing more than 82 kg
(180 lb) on top of rack-mounted devices.
• Use safe practices when lifting.
82 kg (180 lb)
The following is a list of items shipped in your rack installation kit. If any
items are missing or damaged, contact your place of purchase.
• Cable-management assembly
• Cable straps (7)
• Cable ties (10)
• Cage nuts (12)
1
T
e
m
p
l
a
t
e
Use the attached stickers to mark the holes on
the front and the rear of the rack in the
locations indicated by the arrows on the
template.
appliance
and on other devices to properly wired
• Clip nuts (12)
• Screw packages (2)
• Slide rails (2)
2
Cage
nuts
Use a screwdriver or the cage-nut-insertion
tool to insert the cage nuts, or s
nuts,
as required for your rack, into all the
marked holes.
32 kg (70.5 lb)
Clip
nuts
Cage
nuts
lide on the clip

Advertisement

Table of Contents
loading

This manual is also suitable for:

Totalstorage 225

Table of Contents