Pace ST 40A Operation & Maintenance Manual page 41

Table of Contents

Advertisement

9. Place the new metal Compression Spring over the end of the Heater
Assembly .
10. Install the new Heater Retaining Nut to secure the Heater Assembly and
rubber Compression Spring to the Handle.
11. Tighten the white plastic Strain Relief Screw (if present) located at the
rear of the Handle until the screw is flush with or just above the Handle
surface to secure the cable assembly in position. A replacement screw is
supplied in the event that replacement becomes necessary.
12. Perform the Heater Burn In procedure to insure long life. Refer to the
"Set-Up" section of this manual.
Corrective Maintenance
Heater To Cable Assembly Connections
Heater Leads
2 Blue Leads
To 2 Blue Leads
2 Tan Leads
To 2 White Leads
Bare Lead
To Green Lead
Cable Assembly Leads
39

Advertisement

Table of Contents
loading

Table of Contents