Connecting To The Mc Network Or The S/5 Network; Connecting To The Ix Network - GE CARESCAPE B850 Service Manual

Monitor
Hide thumbs Also See for CARESCAPE B850:
Table of Contents

Advertisement

If a non-medical grade display is used as a display within the patient environment it must
always be powered from an additional transformer providing at least basic isolation.
1.
Connect power cords to the mains power supply inlet and to a wall outlet on all system
components that require AC mains power input.
2.
Do not power on any devices.
NOTE: Be sure that all power cords are securely connected and that they are routed through
the retaining clips or cable clamps, as applicable.

6.6 Connecting to the MC Network or the S/5 Network

WARNING
MISSED ALARMS - Do not use with iCentral software with Versions 5.0.3 and
earlier or with Mobile Care Server with Version 5.2 and earlier.
WARNING
INCORRECT CALCULATIONS - Using the System with the Aware Gateway
software version 1.4 or earlier could result in incorrect patient height and
weight information. This could lead to incorrect drug dose calculations,
hemodynamic calculations, or oxygenation calculations. Prior to installing
the System, please contact the GE Healthcare Aware Gateway HL7
Integration Engineering Team or your GE Healthcare service representative
to verify or update your Aware Gateway configuration.
WARNING
EXCESSIVE LEAKAGE CURRENT - Only devices that are specified compliant
with IEC 60950-1 or IEC 60601-1 may be connected to the Ethernet MC or IX
ports.
The patient monitor can be connected either to the wired MC Network or S/5 Network.
Connect the MC Network or the S/5 Network patch cable to the network connector
labelled as "MC" in the rear panel of the patient monitor.

6.7 Connecting to the IX Network

Connect the IX Network patch cable to the network connector labelled as "IX" in the rear
panel of the patient monitor.
Hardware installation
65
2106778-001

Advertisement

Table of Contents
loading

Table of Contents