Grounding And Ac Cabling; Grounding The Ksu; Figure 2-8 Sub-Cover Open Position; Figure 2-9 Mounting The Ksu - NEC SL1100 Hardware Manual

Hide thumbs Also See for SL1100:
Table of Contents

Advertisement

SL1100
The Sub-Cover can be opened and held in the open position.
5.
Align the four holes on the back of the KSU with the four screws installed in the wall.
6.
Slide the KSU into position and tighten the lower two screws.
1.4

Grounding and AC Cabling

The ETH (Earth Ground Lug) is located near the power supply on the KSU. The Sub-Cover must be
opened in order to access to it.
1.4.1

Grounding the KSU

Ensure Main KSU are powered off and unplug the AC cord.
In the KSU, connect the ETH lug to the verified grounding point using a minimum cable size of 14AWG
(Φ2.0 mm) wire.
2-6

Figure 2-8 Sub-Cover Open Position

Figure 2-9 Mounting the KSU

ISSUE 1.0
Installation

Advertisement

Table of Contents
loading

Table of Contents