System Start Up
SECTION 1 SYSTEM START UP
1.1
Before Starting Up the System
Before starting up the system, make sure:
KSU is installed correctly.
All extensions are cabled correctly.
Earth ground and PSTN Trunks are cabled correctly.
All PCBs are configured, equipped, and secured correctly.
AC power cord is cabled correctly.
At least one display type Multiline Telephone is connected to the system. (for Programming)
Pull out the Lithium battery protection sheet, before starting up the system.
1.2
Starting Up the System
There are two methods for startup (COLD Start and HOT Start).
Start Up Method
COLD Start
The factory setting data is loaded.
HOT Start
The customer setting data is loaded.
1.2.1
Perform a Cold Start
This section describes the process for starting the system for the first time or starting a system that
requires the customer data be deleted.
System Start Up
Figure 3-1 Lithium Battery Protection Sheet
Table 3-1 Start Up Method
Description
Purpose
First time start up
System Initialization
System Reboot
3
3-1