3. Installation
3.1 Unpacking StackMaster™TR 16-Port Equipment
USER'S GUIDE
To install the StackMaster™TR 16-Port Active Retiming Managed Hub::
•
Unpack the StackMaster™TR Equipment
•
Stack Units in Rack or on Table
•
Cascade StackMaster™TR Units
•
Connect StackMaster™TR to Network
•
Connect Units to Power
•
Optionally Configure SNMP Network Management
Use the packing contents lists to verify the shipment:
Item
StackMaster Modular Chassis
Special 6-inch DB-25 data cable
Power Cord
User's Guide
Part Number
SMHB-TR-16
6005
3344 (or refer to Appendix D)
7361
3-1
Need help?
Do you have a question about the STACKMASTER TR SMHB-TR-16 and is the answer not in the manual?