Operation
Calibration
Zero/Span Schedule
3-14
49iQ Instruction Manual
The Zero/Span Schedule is used to program the instrument to perform
fully automated zero and span checks or adjustments.
Home Screen>Calibration>Zero/Span Schedule
Home Screen>Calibration>Zero/Span Schedule>More
The Zero/Span Schedule contains the following information:
Zero/Span Schedule: Toggles zero/span schedule Enabled or Disabled.
●
Next Time: Allows the user to view and set the initial date and time
●
(24-hour format) of the zero/span schedule.
Period: Defines the period or interval between zero/span checks or
●
calibrations. If period = 0, the schedule runs continuously.
Zero Duration: Sets how long zero air is sampled by the instrument.
●
Ozonator Level 1
6 Duration: Sets the time duration for ozonator level
●
16.
Purge Duration: Sets how long the purge period will be at the end of
●
the schedule.